Red-bellied Woodpecker    (June 20th) our backyard feeder. 

                          
  Page 2:

Photo page,  vacations and new beach house. (after 15 years we owned this beach property) we launch this ship:

  

VIDEO's ( first FYI )
Costa-de-campo pool Costa lake

Beach house build videos phase 1 and 2, 

 Use Browser back arrow to exit video player use .  This first sections of Vidoes are building the full 2 floor shell, of massive concrete pour.
Phase1 early 2024

Phase 2, November 2024, sealer, primter and final painting over plaster inside and out.


  Final coat of real paint. video  (end 2024)



My punch list:
  • Spring 2025,     Phase 1: Done (  finished   1st floor )
  • Bought all new floor tile and cove base materials.(etc)  1st floor now tile is done floors and bath walls too. and stairs tiled  and plumbing, drains, sinks, and Commode's Done !
  • Phase 2 is all new glass and doors.  Done  then Wood doors are of Cedar. Varnished.  All Done Some plastering was done to meet cove  base,etc.
  • BioSeptic needs plumbed in. Done , (and commodes too)
  • 2nd floor doors are now blocked with temporary plywood to stop birds from sneaking to 1st floor. done.
  • Phase 3, Electrics. ( done) 1st floor  lighting done , and outlets 250vac, and load centers first with new AC KW meter concrete base<   .
  • Next up,  front porch wide and steps leading up to it , concrete, all trash removed and new clean dirt and compacted.  Now done Dec 2025)
  • New 1st floor 6 interior doors, and bunk beds and new glass showers bath rooms Jan-2026 (WIP)
  •                  Bath room 1 and 2 with new shower doors and lighted mirrors.
  • Pending Side jobs to do, is kitchen counters and island and sink plumbing. (  LPG Range (island), oven counter, and Refrigerator, LG or SamSung)

  • 2nd floor is last and not scheduled. (for late 2026? years or future) (but tiled first is first. ,then windows, and electrics last.)

 



This is the details section, big time construction works:

First floor Tile Job May 2025



<<click me, and
see Slide show of 1st floor tile installation completed. done.



This is Video walk through ,  31 May 2025,  all finished tile 1st floor. Done


Windows 1st floor and doors exterior ,  June 2025 - Done.  Lots of glass and 1 cedar front doors   See Window lock test video  

Sanitary done,  the Biodigester anaerobic system  600 liters 160 gallons, actual  completion Video     and the "Rotoplas" see slides of project poo. 



New Beach Video after clean up.

New 2026 Quadracopter aerial view of Costa De Campo.
Status 2026  March, on, is 2nd foor is being wired up now AC power and all pumbing (then floor tile and last windows and doors) See wiring ? day1




We are now seen easy from the club house.

Afar
 
 spare
 
Conception 1:  376  m2  total all floors: By architect:  Ricardo Demarini  Moreno C.A.P 3035 +  Engineer:Civil: Jorge F. Barrento Galvez C.I.P #27104



Real progress:  99% done 1st floor.  (just kitchen sink missing)
All new Soil and machine compacted. Plus 8 stepping pads to the main road. (loop)  ,Interior doors done, (all doors done) 1st floor.


East side view above: Lots of clean dirt added,  5 or more truck loads, tons. Our lot limit is 60-ft. wide (20 meters?) but is 30ft wide home  Note: fire proof.

December 20, 2025 beach side view below, 2nd floor work late next year ? 2026

  back yard ocean side
Lots of debris to pickup still !

One more view of entrance below , the square pads seen afar is the 5000 gallon , fresh water concrete water tanks and water pump pit.
Some day we want grass or ground cover plants.

Some kind of  Grass here, the kind that needs no mowing.


entrance